Installation Requirements #
#
Space Requirements #
- Dimensions: 162โWx 108โH x 24โ D
 
Electrical Supply #
- (3) 3Ph 1/2 HP Electric Motors
 
Water Supply #
- Top: 9 GPM Per Manifold
 - Sides: 18 GPM Per Manifold
 
Product Lines #
- Liquid Connection: 3/4โ FNPT
 
Tools & Materials #
- Hammer drill
 - 5-lb hammer
 - 3/4โ wrench or socket
 - 7/16โ wrench
 - 9/16โ wrench
 - Pair of adjustable wrenches
 - Phillips head screwdriver
 - Wire strippers
 - Channel locks
 - Antiseize lubricant
 - Thread tape
 - 1/2โ x 4โ stainless steel anchors (recommended)
 
Installation Preparation #
- Unload the equipment and ensure nothing has been not damaged during transportation prior to beginning installation.
 - Refuse delivery if the equipment is damaged
 
Placement – Bare Arch (Standard) #
- The center of the 12โ cross bar should be on the vehicle centerline of your car wash tunnel (generally on the right hand side of the conveyor pit).
 - Legs can be adjusted side to side to meet your specific tunnel requirements before anchoring to the floor
 - Recommended Position – Driver Side
- The center of the blastITโs driver side leg should be 40.5โ from the conveyorโs โrightโ side guide rail (inner rail).
 
 - Recommended Position – Passenger Side
- The center of the passenger side leg should be 96.5โ from the conveyorโs โrightโ side guard rail (inner rail).
 
 