3. Installation #
Installation of the dispenseIT must conform to local plumbing, electrical, and sanitation codes. The customer is responsible for obtaining all permits and ensuring the following conform to all state and local codes before installing the dispenseIT.
3.1 Installation Preparation #
Locate where the dispenseIT will be installed with your installer. Take into consideration the following points:
- Location of the water supply, air supply, and 3PH electrical supply for the dispenseIT
- Location of the control wiring from tunnel controller for the dispenseIT
- Location of any equipment that may be spraying water
- Distance from the dispenseIT to the applicator arches
Refer to Fig. 3.1 – 1 for solenoid, air regulator, and valve alignment for each function.
Fig. 3.1 – 1 – Solenoid, air regulator, and valve alignment
3.2 Mechanical Installation #
Place equipment in the equipment room where the installation will take place. If possible, have the unit away from areas where the pump could take a direct spray from liquids.
- Floor Mount: Turn the swivel casters so the wheels point forward and lock in place to ensure maximum stability.
- Safety chain: Not required.
- Wall Mount: Place the pump on the floor to the right of the unit.
- Install a stainless steel guard around the pumpโs base to avoid damage by barrels, barrel carts, etc.
- Recommended height is at least 4โ, measured from the bottom of the frame to the floor.
Fig. 3.2 – 1-2 – dispenseIT System Connections
3.2.1 Installing Water Line #
- Install a 2โ water feed line to the location of the dispenseIT.
- Existing Buildings: Flush the new water line for a minimum of 5 minutes to ensure that any debris in the water line is completely flushed out.
- New Buildings: Flush the water line for a minimum of 15 minutes to ensure that any debris in the water line is completely flushed out.
- Install the water feed line to the inlet side of the pump using appropriate fittings for site hosing.
Fig. 3.2.1 – 1 – Water line connection
3.2.2 Installing Air Line #
- Install the main airline feed to the inlet side of the Main Air Regulator.
Fig. 3.2.2 – 1 – Airline feed to Main Air Regulator
3.2.3 Installing Liquid and Air Connections for Functions #
- NOTE: High Flow injectors (above 5 GPM) require a ยพโ process line.
- Connect ยฝโ liquid lines to the appropriate injector port as specified in your customer configuration form. (Fig. 3.2.3 – 1)
Fig. 3.2.3 – 1 – Liquid connection to injector port
- Connect 3/8โ poly tube air lines to the appropriate foam port on top of the system as specified on the customer configuration form. Functions are identified 1-10, 1-15, or 1-20 from left to right.
- Turn on water and line supplies and check for leaks.
3.3 Electrical Installation #
- WARNING: Electrical installation must be performed by a qualified electrician. Follow all local codes. 3PH breaker power must be supplied by the customer.
The electrical schematics and connection points in the controller are designated in Appendix 4.
- Confirm system voltage prior to starting electrical installation.
- Install the pumpโs electrical connections.
- Use the bottom hole of the pumpโs electrical box for the 3PH incoming power (Fig. 3.3 – 1)
Fig. 3.3 – 1 – Pump 3PH incoming power connection
- Connect the grounding conductor to the ground lug (Fig. 3.3 – 2).
Fig. 3.3 – 2 – Pump grounding conductor and ground lug
- Connect the 3PH power to the pumpโs terminal strip (terminal wiring plug can pull out for wiring ease). Inspect to ensure the terminal plug is fully seated.
- Make electrical connections as listed in the tables below.
- NOTE: Voltage from the tunnel controller relay matches that of the coils on the dispenseIT (110VAC, 24VAC, or 24VDC).
Enclosure Terminal Connection | Details |
---|---|
PTS1 | Terminal 2 on Grundfos Pump |
PTS2 | Terminal 6 on Grundfos Pump |
TS 1-20 | Tunnel controller normally open relay |
NTS 1-11 | 1 neutral wire any of NTS terminals (from same power source that works with the power from the tunnel controller relay) |
GND | Customer supplied ground |
#
#
Fig. 3.3 – 3 – Electrical enclosure connection points
3.4 Installing Injectors #
The dispenseIT arrives with any High Flow injectors installed from the factory. Standard Flow injectors are shipped with the unit. Installation of Standard Flow injectors is done via provided quick connectors.
- Install metering tips into the barb of the injector. Consult your chemical solutions provider for dilution rates.
- Install a ยผโ chemical compatible hose from the chemical barrels to the injector barb.
- Install chemical compatible foot valves for each function on the draw side of the hose (the part of the hose that rests inside of the product barrel).
- It is recommended to use a 3โ piece of PVC pipe for the line to run through to keep the suction straight down in your chemical barrel.