4. Startup & Operation
WARNING! Check and verify the tightness of all power distribution lines (screw terminals) before the startup process
NOTE: Ensure all steps and precautions in Section 3 have been completed before starting up the high-pressure arch
4.1 Flushing The Lines
- Turn on the pump and flush out the lines for a minimum of 10 minutes.
- Install all nozzles.
- Ensure that there are no leaks.
- Ensure that all remaining hardware is tightened.
4.2 Confirm Operation
- Ensure all bearings have been greased prior to starting the system.
- Start the system and confirm the operational sweep and direction of the manifolds is adjusted to desired settings. Refer to Section 3.2.2 to adjust oscillation.
- Ensure high-pressure plumbing and electrical connections are not bound during operation/oscillation.